Information Disclosure on Environmental Prevention and Control of Hazardous Waste Pollution in 2023
According to the requirements of the Solid Waste Pollution Prevention and Control Law of the People's Republic of China, units that generate, collect, store, and utilize solid (hazardous) waste shall timely disclose information on hazardous waste pollution in accordance with the law and actively accept social supervision. Based on the actual situation of our company, we hereby disclose the information on the prevention and control of hazardous waste pollution in 2023 as follows:
1、 Information disclosure of hazardous waste generation units:
Enterprise Name: Weifang Huateng Printing and Dyeing Weaving Co., Ltd
Address: Chemical Warehouse Park, Longchi Town, Changyi City, Shandong Province
Environmental Protection Manager and Phone: Qi Xin 13906367315
Hazardous waste scale:<10 tons/year
Number of hazardous waste storage points: hazardous waste warehouses? 1? Location
The building area of hazardous waste storage facilities is 50 square meters for the storage of hazardous waste generated and collected within the factory area.
Emergency measures: In case of hazardous waste leakage, on-site personnel shall immediately report to the superior workshop leader. The workshop leader shall immediately notify the management personnel of the Industrial Engineering Department and organize emergency rescue personnel to rush to the site of the accident, and dispose of it according to the company's emergency response plan for sudden environmental incidents. All production workshops and hazardous waste warehouses in the factory area are equipped with emergency supplies.
2、 Information Disclosure on Hazardous Waste Generation in 2023: